Friday, February 5, 2016

Friday, February 5, 2016

Nothing!!!!    So I'll be here all weekend.  The other Daily trucks are still here too.  Not good!!!

Thursday, February 4, 2016

Thursday, February 4, 2016

Left at sunrise and drove down to Raleigh and delivered the dozer. I really love driving those things!!!  The power they have is amazing!!!  Can feel it.  Anyway, I didn't have another load yet so I drove over to the Petro truck stop in Kenly, NC to wait for my next one. Sure hope it is soon.  There are several other Daily trucks here waiting too.  That's a bad sign.

Wednesday, February 3, 2016

Wednesday, February 3, 2016

Went over to the rest area in West Virginia and met the Bridge Monitor (white pick up in the photo below), and the escort (parked behind the Bridge Monitor in the photo below).


We left and went across the bridge at 30 mph (48 kph) with no problems.  Once we were across they took the exit and went back for the next one.  I kept on going.  Overcast and some rain most of the day.  Other than that, no problems today.  Stopped for the night at the Petro in Mebane, North Carolina. Will deliver tomorrow morning.  Don't have another load yet.

Tuesday, February 2, 2016

Tuesday, February 2, 2016

Timed it perfectly this morning and entered Kentucky at Louisville right at 9 am. Had a short day today.  There is a bridge 17 miles in West Virginia that the State is requiring a "Bridge Monitor" and an escort car when I go over it.  I have to go over it at 30 mph (48 kph).  I'm assuming that the escort car will do a rolling road block and slow traffic behind me while I go across the bridge by myself.  I assume the Bridge Monitor is there to make sure that we actually do it.  There are 4 of us going over tomorrow morning. I'm the first.  We will be meeting everyone at the rest area at mile marker 10 in the morning. I stopped for the night at the Flying J truck stop in Catlettsburg, KY. I'm about 20 minutes from the rest area.   Can't park at the rest area overnight in West Virginia.  They do not allow "Oversize Loads" to park in the rest areas overnight.

Monday, February 1, 2016

Monday, February 1, 2016

Went across the street first thing this morning and loaded a Caterpillar D7R Dozer that is going to Raleigh, North Carolina.  As soon as I started I knew my front brakes were not good.  So I stopped back at the TA truck stop in Bloomington, IL and got them replaced.  Thought it might be a good idea to have good brakes when I'm 111,000 pounds (50349 kg).



When that was fixed I left.  Didn't get too far today.  Stopped for the night at a truck stop in Austin, Indiana when I ran out of daylight.  Can't start too early tomorrow because I can't go through Louisville, KY until after 9 am.

Sunday, January 31, 2016

Sunday, January 31, 2016

This morning I went over to the repair shop at the TA and had routine maintenance done on the truck and generator.  When that was done I drove over to the Daily yard in Morton, Illinois. It is right across the street from where I load in the morning.  

I really hate it when football season is over!!!!!