Wednesday, November 30, 2011

Wednesday, November 30, 2011

Left the truck stop this morning and drove into De Witt, IA to deliver the generator.  The crane was late and then when he got there he drove past us three times before he figured it out. Us flagging him down helped too.  To get the generator off my truck and placed where it was going to live the crane had to go into the parking lot and lift the generator off my truck and then up and over the trees. 





After that drove across the state to Vermillion, South Dakota and dropped off the feeder.  Then turned around and went back to Elk Run Heights, Iowa to the Flying J truck stop for the night.  Next load is in the morning in Dubuque, Iowa.

No comments:

Post a Comment