They finally came by to unload us late this morning. After the nacelle was unloaded it was my turn. I pulled up next to the crane once again to the edge of the hole for the tower substructure. This is what it looks like before they pour the concrete.
Once empty I drove to the Petro in Salina, KS for the night.
No comments:
Post a Comment