Today was a bit better. Went over to the port in Dundalk, MD this morning and unloaded the chassis. Thought you would be interested in how that happens, so here it is.
Pull up next to "Big Red", the 25 year old crane. They bring over a flat and sit it next to me.
After I un-chain the chassis the workers attach the crane rigging to it.
Then they lift it off.
Then they secure it to the flat for transport.
Then it goes on the boat when it gets there.
Next load is in Abingdon, VA. Loads tomorrow at 2 pm. After taking a shower, I got on the road toward Abingdon. Stopped for the night at the Petro truck stop in Raphine, VA.
No comments:
Post a Comment