Arrived at GE in Pensacola, FL to load at 7:30 am. At 4 pm. I got called to go back in to load. Of course there was a thunder storm going on at that time. Got in line there (4th in line) and waited for another 2 hours before they started to load everyone. Finally got loaded with another wind energy hub. It is going out to Colorado.
I left there at 7:30 pm and drove back to the Oasis truck stop in Robertsdale, Alabama. Ran out of daylight.
I left there at 7:30 pm and drove back to the Oasis truck stop in Robertsdale, Alabama. Ran out of daylight.
No comments:
Post a Comment